Step 1 ĄG
aĄG Slot on PVC pipe
bĄG Smooth side facing upward
cĄG Grooved side facing downward
Step 2 ĄG
dĄG Insert drain belt into slot of pipe
eĄG Seal the end holes of the belt with tape or glue
Step 3 ĄG
f ĄG Seal upside clearance with silicon
gĄG Sand layer protecting the belt from mud under
AĄG 10 M at most
BĄG At least 40 cm
CĄG 1~4M depending on soil permeability
DĄG Depending on rain intensity and flow rate to determine size of the collecting pipe
BĄG At least 40 cm
CĄG 1~4M depending on soil permeability or drain time required
DĄG Depending on rain intensity and flow rate to determine size of the collecting pipe
 
Horizontal drainage diagram ĄG
AĄGCapiphon Drain belt
BĄGCollecting drain pipe
CĄGInfiltration water
DĄGGround water flow

 

Vertical
Step 1 ĄG
aĄGSlot on PVC pipe
bĄG Smooth side facing upward
cĄG Grooved side facing downward
Step 2 ĄG
dĄG Insert drain belt into slot of pipe
eĄG Seal the end holes of the belt with tape or glue
Step 3 ĄG
fĄG Seal belt smooth side gap with silicon
gĄG Sand layer protecting the root from mud infiltration
Step 4 ĄG
bĄGSmooth side
cĄGGrooved side
hĄGVertical center lin
iĄGAngle > 5 degree
Retaining wall ĄG Vertical drainage diagram
AĄGNailing against wall or extended toward hill slope
BĄGCapiphon drain belt
CĄGCollecting drain pipe
DĄGGround water flow

 

Capiphon Drain Pipe assembly
Step 1 ĄG
aĄGEnclose the belt
bĄG Pipe (Outside diameter 63mm )
Step 2 ĄG

cĄGConnector

(Fixed with screw or rivet )
Step 3 ĄG

dĄGInfiltration water flow

(Flow into the pipe through gap of connector )

© 2004 .Capiphon ( Drain ) Corporation All Rights ReservedĄ@Ą@Ą@Ą@ Ą@Ą@Ą@Email:

1F., No.171, Sec. 1, New Taipei Blvd., Sanchong Dist., New Taipei City 241, TaiwanĄ@Ą@
Ą@TelĄG+886-2-89832201Ą@Ą@Ą@FaxĄG+886-2-89832445