Horizontal

Step 1 :
a: Slot on PVC pipe
b: Smooth side facing upward
c: Grooved side facing downward
Step 2 :
d: Insert drain belt into slot of pipe
e: Seal the end holes of the belt with tape or glue
Step 3 :
f : Seal upside clearance with silicon
g: Sand layer protecting the belt from mud under
A: 10 M at most
B: At least 40 cm
C: 1~4M depending on soil permeability
D Depending on rain intensity and flow rate to determine size of the collecting pipe
BAt least 40 cm
C 1~4M depending on soil permeability or drain time required
D Depending on rain intensity and flow rate to determine size of the collecting pipe
 
Horizontal drainage diagram :
A:Capiphon Drain belt
B:Collecting drain pipe
C:Infiltration water
D:Ground water flow

 

Vertical
Step 1 :
a:Slot on PVC pipe
b: Smooth side facing upward
c: Grooved side facing downward
Step 2 :
d: Insert drain belt into slot of pipe
e: Seal the end holes of the belt with tape or glue
Step 3 :
f: Seal belt smooth side gap with silicon
g: Sand layer protecting the root from mud infiltration
Step 4 :
b:Smooth side
c:Grooved side
h:Vertical center lin
i:Angle > 5 degree
Retaining wall : Vertical drainage diagram
A:Nailing against wall or extended toward hill slope
B:Capiphon drain belt
C:Collecting drain pipe
D:Ground water flow

 

Capiphon Drain Pipe assembly
Step 1 :
a:Enclose the belt
b: Pipe (Outside diameter 63mm )
Step 2 :

c:Connector

(Fixed with screw or rivet )
Step 3 :

d:Infiltration water flow

(Flow into the pipe through gap of connector )